FedEx Buildback

Market Type: Industrial
Engineer:
K2 Engineering
General Contractor:
Harvest Construction
Location:
Lebanon, TN
Size & Description:
The goal of this project was to repair the building after a tornado. The focus was on fixing entire electrical infrastructure and emergency power infrastructure. For 24 hours, the site had emergency temporary power for the entire facility. This 750,000 sq ft facility was tested, and all compromised parts were replaced prior to the utility reconnecting the site.